All documents
This presentation was given to stakeholders of the planned Ruhuhu Irrigation Project in Tanzania, updating them on a pre-feasibility study conducted by CRIDF. It presents findings from soil analysis, marketing and agronomic studies, irrigation systems design studies, and economic analysis. It also includes plans for the Kikonge Hydropower Project.…
Year: 2014
Produced by: CRIDF
File size: 1.8 MB
These slides were used to present the Kikonge Hydropower Project to the Tanzania Electric Supply Company Limited, as a project proposed for the Ruhuhu River Basin in Tanzania. The slides include maps, plans, a reservoir operation simulation, economic details and information on environmental and social impacts.…
Year: 2014
Produced by: CRIDF
File size: 1.5 MB
This presentation, produced for a meeting of CRIDF’s Project Management Unit, offers an overview of CRIDF’s involvement with the Kavango–Zambezi Transfrontier Conservation Area as of July 2014. It includes brief summaries of CRIDF’s activities and aims as well as basic information, maps and photos of the area.…
Year: 2014
Produced by: CRIDF
File size: 3.2 MB
This document reports on hydrological investigations conducted by SLR Environmental Consulting Namibia on the Namibian side of the Kavango–Zambezi Transfrontier Conservation Area, as part of the bankability stage of CRIDF’s Water Infrastructure for Livelihoods Intervention. The report describes the pegging and sampling of boreholes at the seven…
Year: 2014
Produced by: CRIDF
File size: 1.3 MB
This 11-page document outlines and explains the steps involved in the procurement and implementation monitoring stages of a project.…
Year: 2014
Produced by: CRIDF
File size: 342 KB
This 17-page document outlines and explains the steps involved in the eligibility and scoping stages of a project. An example scope of work for a dam project in Malawi is included in the Annex.…
Year: 2014
Produced by: CRIDF
File size: 342 KB
This 19-page guide for portfolio teams provides a brief overview of CRIDF’s procurement process, outlining the basic steps to undertake procurement activities on infrastructure projects.…
Year: 2014
Produced by: CRIDF
File size: 833 KB
This report describes two water allocation models developed for the Umbeluzi Basin by ARA-Sul, in collaboration with Wetterskip Fryslân and FutureWater. A strategic model was designed to evaluate policies and their impact on water demands, supply and shortages, while an operational model was built to evaluate the impact of permits and licenses on the Pequenos…
Year: 2014
Produced by: FutureWater
File size: 5 MB
This presentation gives a detailed description of a modelling platform chosen for application in the transboundary Save River Basin. The platform was originally adapted from a Canadian system and enhanced for Southern African conditions. It includes a Water Resource Yield Model and Water Resource Planning Model, both of which are described in the presentation…
Year: 2014
Produced by: CRIDF
File size: 5.8
This presentation is an overview of CRIDF’s projects in four transboundary river basins: the Pungwe, Buzi and Save (collectively known as Pubusa) and Central Zambezi. It offers particular detail on the objectives and rationale for: CRIDF’s provision of technical assistance to the river basin organisation ARA-Centro; the CRIDF Climate Resilience Fund…
Year: 2014
Produced by: CRIDF
File size: 5.4 MB