Progress report on borehole positions, pegging and water sampling for CRIDF’s Water Infrastructure for Livelihoods Intervention in Kavango–Zambezi, Namibia
This document reports on hydrological investigations conducted by SLR Environmental Consulting Namibia on the Namibian side of the Kavango–Zambezi Transfrontier Conservation Area, as part of the bankability stage of CRIDF’s Water Infrastructure for Livelihoods Intervention. The report describes the pegging and sampling of boreholes at the seven sites that were identified for small-scale water infrastructure development, while also providing necessary information for the tendering and drilling stages.
Full title: Progress report on borehole positions, pegging and water sampling for CRIDF’s Water Infrastructure for Livelihoods Intervention in Kavango–Zambezi, Namibia
Basin:
Zambezi
Document type:
Report
Date produced:
2014
Produced by:
CRIDF
CRIDF phase:
CRIDF Phase 1
Length:
20 pages
File size:
1.3 MB
File type:
PDF