Skip to content
Ground Floor, Block G, Hatfield Gardens, 333 Grosvenor Street, Pretoria, 0083, South Africa.
enquiries@cridf.com
CRIDF RC
Resource Centre
  • Home
  • About
    • CRIDF’s aims and approaches
    • Why we work in Southern Africa
    • CRIDF’s focus on working collaboratively
    • Who are we?
  • What we do
    • Mobilising Finance
    • Infrastructure Project Support
    • Project Types
  • Rapid Advisory Service (RAS)
    • What is the RAS?
  • CRIBMap
  • Resources
    • Resource Centre
    • Learning pieces
      • Livelihoods projects
      • Gender journey
      • Organisational baseline report
      • Rapid Advisory Service assessment
      • Border towns
      • New tools and datasets
  • Contact us
RC Home
/
Publications
/
Publications
/
Page 19
Search and filter
Reset search
Presentation on OKACOM’s visioning process

This presentation details the visioning process of the Okavango River Basin Water Commission. It was produced for the Multi-Sector Investment Opportunity Analysis National Consultation Workshop in Botswana in September 2015. The vision for the Basin considers development in economic, social and environmental terms. This presentation explains the…

Year: 2015
File size: 906 KB

Read More Open resource Download resource
Characterisation of regional ‘virtual water’ transfers: Phase II deliverables

This document provides detailed data on virtual water transfers into and out of CRIDF countries and the Democratic Republic of Congo. It combines three deliverables: the first two comprise a preliminary analysis of country-level data collected on time-averaged virtual water transfers. The third is a final activity report that includes a comprehensive…

Year: 2014
File size: 5.4 MB

Read More Open resource Download resource
Update presentation for the Ruhuhu Multipurpose Project, Tanzania

This presentation, produced for a meeting of CRIDF’s Project Management Unit, offers an overview of CRIDF’s involvement with the Ruhuhu Multipurpose Project in Tanzania as of February 2014. It includes brief summaries of CRIDF’s activities and aims in Ruhuhu as well as maps and schematics of the Project.…

Year: 2014
File size: 188 KB

Read More Open resource Download resource
Presentation of a pre-feasibility study for the Ruhuhu Irrigation Project in Tanzania

This presentation was given to stakeholders of the planned Ruhuhu Irrigation Project in Tanzania, updating them on a pre-feasibility study conducted by CRIDF. It presents findings from soil analysis, marketing and agronomic studies, irrigation systems design studies, and economic analysis. It also includes plans for the Kikonge Hydropower Project.…

Year: 2014
File size: 1.8 MB

Read More Open resource Download resource
Presentation on the Kikonge Hydropower Project for the Ruhuhu River Basin, Tanzania

These slides were used to present the Kikonge Hydropower Project to the Tanzania Electric Supply Company Limited, as a project proposed for the Ruhuhu River Basin in Tanzania. The slides include maps, plans, a reservoir operation simulation, economic details and information on environmental and social impacts.…

Year: 2014
File size: 1.5 MB

Read More Open resource Download resource
Update presentation on CRIDF activities in Kavango–Zambezi, Namibia

This presentation, produced for a meeting of CRIDF’s Project Management Unit, offers an overview of CRIDF’s involvement with the Kavango–Zambezi Transfrontier Conservation Area as of July 2014. It includes brief summaries of CRIDF’s activities and aims as well as basic information, maps and photos of the area.…

Year: 2014
File size: 3.2 MB

Read More Open resource Download resource
Progress report on borehole positions, pegging and water sampling for CRIDF’s Water Infrastructure for Livelihoods Intervention in Kavango–Zambezi, Namibia

This document reports on hydrological investigations conducted by SLR Environmental Consulting Namibia on the Namibian side of the Kavango–Zambezi Transfrontier Conservation Area, as part of the bankability stage of CRIDF’s Water Infrastructure for Livelihoods Intervention. The report describes the pegging and sampling of boreholes at the seven…

Year: 2014
File size: 1.3 MB

Read More Open resource Download resource
CRIDF generic scope of works for the procurement and implementation monitoring stages

This 11-page document outlines and explains the steps involved in the procurement and implementation monitoring stages of a project.…

Year: 2014
File size: 342 KB

Read More Open resource Download resource
CRIDF generic scope of works for the eligibility and scoping stages

This 17-page document outlines and explains the steps involved in the eligibility and scoping stages of a project. An example scope of work for a dam project in Malawi is included in the Annex.…

Year: 2014
File size: 342 KB

Read More Open resource Download resource
CRIDF procurement guidelines

This 19-page guide for portfolio teams provides a brief overview of CRIDF’s procurement process, outlining the basic steps to undertake procurement activities on infrastructure projects.…

Year: 2014
File size: 833 KB

Read More Open resource Download resource
19

Copyright © 2025. | CRIDF privacy notice
This site uses cookies: Find out more.