Skip to content
Ground Floor, Block G, Hatfield Gardens, 333 Grosvenor Street, Pretoria, 0083, South Africa.
+27 (0)12 364 0720
enquiries@cridf.com

CRIDF RC

Resource Centre
  • Home
  • About
    • CRIDF’s aims and approaches
    • Why we work in Southern Africa
    • CRIDF’s focus on working collaboratively
    • Who are we?
  • What we do
    • Mobilising Finance
    • Infrastructure Project Support
    • Project Types
  • Rapid Advisory Service (RAS)
    • What is the RAS?
    • Submit a RAS request
    • RAS Feedback Questionnaire
  • Investment opportunities
  • CRIBMap
  • Resources
    • Resource Centre
    • Learning pieces
      • Livelihoods projects
      • Gender journey
      • Organisational baseline report
      • Rapid Advisory Service assessment
      • Border towns
      • New tools and datasets
  • News
    • Blog
    • Events
      • World Water Week
    • Newsletter
  • Contact us
  • Welcome to CRIDF’s Resource Centre

    The CRIDF Resource Centre brings together a large collection of resources related to CRIDF’s work to provide long-term solutions to water issues that affect the lives of the poor in Southern Africa. Pooling resources from both the CRIDF programme and external stakeholders, this tool will grow to provide a broad range of resources related to transboundary water management, large infrastructure projects and approaches to tackling the water issues faced by countries in Southern Africa.

    How to use

  • This is Phase 3 of the CRIDF Resource Centre.
    The Resource Centre now contains documents referring to all basins CRIDF works in. The site will be continually maintained with new resources added regularly.

  • Search and filter

    Reset search

    All documents

    Presentation on the Kikonge Hydropower Project for the Ruhuhu River Basin, Tanzania

    These slides were used to present the Kikonge Hydropower Project to the Tanzania Electric Supply Company Limited, as a project proposed for the Ruhuhu River Basin in Tanzania. The slides include maps, plans, a reservoir operation simulation, economic details and information on environmental and social impacts.…

    Year: 2014
    Produced by: CRIDF
    File size: 1.5 MB

    Read More Open resource Download resource
    Update presentation on CRIDF activities in Kavango–Zambezi, Namibia

    This presentation, produced for a meeting of CRIDF’s Project Management Unit, offers an overview of CRIDF’s involvement with the Kavango–Zambezi Transfrontier Conservation Area as of July 2014. It includes brief summaries of CRIDF’s activities and aims as well as basic information, maps and photos of the area.…

    Year: 2014
    Produced by: CRIDF
    File size: 3.2 MB

    Read More Open resource Download resource
    Progress report on borehole positions, pegging and water sampling for CRIDF’s Water Infrastructure for Livelihoods Intervention in Kavango–Zambezi, Namibia

    This document reports on hydrological investigations conducted by SLR Environmental Consulting Namibia on the Namibian side of the Kavango–Zambezi Transfrontier Conservation Area, as part of the bankability stage of CRIDF’s Water Infrastructure for Livelihoods Intervention. The report describes the pegging and sampling of boreholes at the seven…

    Year: 2014
    Produced by: CRIDF
    File size: 1.3 MB

    Read More Open resource Download resource
    CRIDF generic scope of works for the procurement and implementation monitoring stages

    This 11-page document outlines and explains the steps involved in the procurement and implementation monitoring stages of a project.…

    Year: 2014
    Produced by: CRIDF
    File size: 342 KB

    Read More Open resource Download resource
    CRIDF generic scope of works for the eligibility and scoping stages

    This 17-page document outlines and explains the steps involved in the eligibility and scoping stages of a project. An example scope of work for a dam project in Malawi is included in the Annex.…

    Year: 2014
    Produced by: CRIDF
    File size: 342 KB

    Read More Open resource Download resource
    CRIDF procurement guidelines

    This 19-page guide for portfolio teams provides a brief overview of CRIDF’s procurement process, outlining the basic steps to undertake procurement activities on infrastructure projects.…

    Year: 2014
    Produced by: CRIDF
    File size: 833 KB

    Read More Open resource Download resource
    Water allocation models for the Umbeluzi River Basin, Mozambique

    This report describes two water allocation models developed for the Umbeluzi Basin by ARA-Sul, in collaboration with Wetterskip Fryslân and FutureWater. A strategic model was designed to evaluate policies and their impact on water demands, supply and shortages, while an operational model was built to evaluate the impact of permits and licenses on the…

    Year: 2014
    Produced by: FutureWater
    File size: 5 MB

    Read More Open resource Download resource
    Selection and agreement on the most appropriate modelling platform to develop operating rules for the Save Basin

    This presentation gives a detailed description of a modelling platform chosen for application in the transboundary Save River Basin. The platform was originally adapted from a Canadian system and enhanced for Southern African conditions. It includes a Water Resource Yield Model and Water Resource Planning Model, both of which are described in the presentation…

    Year: 2014
    Produced by: CRIDF
    File size: 5.8

    Read More Open resource Download resource
    The Pungwe, Buzi and Save (Pubusa) and Central Zambezi Basins portfolio

    This presentation is an overview of CRIDF’s projects in four transboundary river basins: the Pungwe, Buzi and Save (collectively known as Pubusa) and Central Zambezi. It offers particular detail on the objectives and rationale for: CRIDF’s provision of technical assistance to the river basin organisation ARA-Centro; the CRIDF Climate Resilience…

    Year: 2014
    Produced by: CRIDF
    File size: 5.4 MB

    Read More Open resource Download resource
    Eligibility screening Swaziland – final activity report

    This final activity report documents the screening of five proposals for projects located within Swaziland, involving the Incomaputo and Umbeluzi River Basins. The activity was to conduct CRIDF Screen 1 assessments of those five proposals to determine their eligibility for CRIDF support. All five projects passed the Screen 1 Eligibility Assessment.…

    Year: 2014
    Produced by: CRIDF
    File size: 485 KB

    Read More Open resource Download resource
    Pages:«‹12345678910111213141516171819202122232425›»

    Copyright © 2021. | CRIDF privacy notice
    This site uses cookies: Find out more.